Tuesday, May 18, 2010

09:30 - 10:15

Registration and Coffee

10:15 - 10:30

Opening Session

10:30 - 12:00

Session 1  : Fieldbuses for Process Control and factory automation

 

Using Digital Networks for Control in the Field, Travis Hesketh - Vice Chair, Fieldbus Foundation Steering Committee Europe Middle East & Africa

Slides

 
See abstract

We will focus on the economic, schedule and process benefits of Foundation Fieldbus. Major plant operational benefits are available when IEC 61158 Foundation Fieldbus Capital Projects are completed faster and at lower cost using Foundation technology. Sales of Foundation Technology approaches $1bn in 2010. Modelling work completed in the past 6 months by Strathclyde University related company ISC Ltd demonstrates that Control in the Field can deliver over 30% better control response and rejection of disturbance.
Foundation Fieldbus Control in the Field is used extensively to deliver additional benefits: Shell Global Solutions International: "…major benefits identified by SGSI are reduced process controller loading, reduced network traffic enabling more loops per segment, as well as very fast loop response".Finally we will explore the proposition of using control in the field. With intelligent measurement and control devices with backup mode is 3x more reliable than conventional analogue.

 

From Field realtime communication up to Energy cost savings with PROFINET and PROFIenergy, Patrick BRASSIER - Product Manager, Industrial Communication, Siemens IA&DT France

Slides

 

 

See abstract

PROFINET the innovative open standard for Industrial Ethernet satisfies all requirements of automation technology. PROFINET enables solutions to be developed for factory automation, including safety applications, Wireless communication and the entire range of drive technology up to and including isochronous motion control applications. Moreover, with PROFIenergy, its latest application Profile, PROFINET is used in production environments for costs reduction through energy savings, thereby contributing actively to environmental protection.

12:00 - 14:00

Lunch break

 

 

14:00 - 15:30

Session 2: Industrial wireless solutions and wireless sensor networks

 

IEC 62591 wireless standard for process manufacturing, Ann Robin, Jose Luis Juncar – Director, Wireless Emerson Process Management

 
See abstract
With the recent standard IEC 62591 approval (26 March 2010) the first process manufacturing global wireless standard. This unanimous certification is a major industry milestone: wireless control benefits process costs and benefits plant operation. Following an introduction to Emerson  Vision and Solutions for Wireless Communications in Process Plants , we will indentify several areas where wireless enables production, operations, maintenance and projects functions to take a fundamentally different approach which will have a significant and immediate impact on business performance. This will be demonstrated with world class wireless reference applications.

 

 

WSN deployments with CSEM WiseNET, Dr. Philippe Dallemagne, Project Manager, Centre Suisse d'Electronique et de Microtechnique

Slides

 

 

See abstract

CSEM is an R&D center active in various domains, such as micro-electronics, mechatronics, optoelectronics and information technology. During the last 10 years, CSEM developed an original full-blown WSN technology called WiseNET, based on in-house developed hardware as well as COTS components. WiseNET is recognised for its ultra-low power and effectiveness properties in low duty-cycle, low data-rate applications.
WiseNET has been deployed in several contexts, such as fire or flood detection, cliff or bridge monitoring, water quality monitoring, people tracking, transportation systems, etc.
The talk will give an overview of the CSEM WiseNET technology, a brief description of selected deployments and the main learned lessons.

15:30 - 16:00

Coffee break

16:00 - 17:30 Session 3: Communication systems for broader applications
  e-maintenance, Dr. Jean-Baptiste Léger, President of PREDICT company - not presented
 
See abstract

To follow...

 

Frame latency evaluation: when simulation and analysis alone are not enough, Nicolas Navet, INRIA / RTaW, Aurélien Monot, LORIA/PSA, and  Jörn Migge, RTaW

Slides

 
See abstract

This talk is about temporal verification in real-time communication systems. Early in the design cycle, the two main approaches for verifying timing constraints and dimensioning the networks are worst-case schedulability analysis and simulation. The aim of the talk is to demonstrate that both provide complementary results and that, most often, none of them alone is sufficient. In particular, it will be shown that response time distributions that can be derived from simulations cannot replace worst-case analysis. This will be done on automotive case-studies using RTaW analysis and simulation software tools.

17:30 - 18:00

Panel Discussion: What are R&D needs on fieldbus and wireless technology for industrial applications ? (tentative title) Chair: Ye-Qiong Song

18:00